Why permits come first
Before a crew can break ground, the builder needs a permit from the city. The permit lists the job address, the type of work and the licensed contractor in charge, and it becomes a public record as soon as the city issues it. At that point the builder has a start date to hit, and many of the subcontractors and suppliers on the job have not been chosen yet.
That gap is the opportunity. Bid boards show commercial projects that are already out for bid, with many companies chasing each one. A new permit is often the first public sign of a job, and the builder on it is someone you can call this week.
3,097projects got permits in the last seven days across our 27 cities. See this week's biggest projects.
What a permit tells you
- The address. Where the work is, so you can sort by distance and ZIP code.
- The type of work. A new building, a remodel, an addition, a pool, a roof or a solar install. It tells you whether the job needs your trade at all.
- The size. Square footage, floors and units when the city records them. Size is the best quick guess of how much work there is for you.
- The declared value. What the applicant wrote down as the cost of the work. Use it to rank jobs, not as a budget: it is often lower than what the job really costs.
- The contractor. The licensed company responsible for the work. On a building permit it is usually the general contractor, the one who hires the subs and orders the materials.
- The dates. When the permit was issued and when it expires.
One job often has several permits: the main building, a garage, a pool, a demolition. PermitLeadsHQ groups the permits of each job site into one project, so you call the builder once, not five times.
Who to call, and who not to
Call the builder on the permit. On most jobs the general contractor chooses the subcontractors and decides where the materials come from, so the property owner is rarely the right first call.
The exception is an owner-builder permit, where the owner pulls the permit and runs the job. Those are mostly small home projects, and we mark them so you can skip them.
Then look at how many open jobs the same builder has. A company running eight projects in your area is worth a real relationship, not one bid. Every city page lists its most active builders, and each project page shows the builder's other open jobs.
When to call, trade by trade
Each trade has its own window. A rough guide for new buildings (every job is different):
| Trade | Good time to call | Why |
|---|---|---|
| Site work, excavation, concrete | The first days after the permit | They are on site first, so the builder lines them up before the start date. |
| Framing, lumber, trusses | The first two weeks | Crews and material orders are booked early. |
| Electrical, plumbing, HVAC | The first few weeks | Rough-in comes after framing, but bids are often settled early. |
| Roofing, windows, siding | A few weeks in | They close the building in once the frame is up. |
| Drywall, insulation, flooring, cabinets | One to three months in | Finish trades are chosen later, so an older list still works. |
Remodels move faster. On a kitchen remodel or an office build-out, call in the first days.
A weekly routine
- Pick your area and your trades. The ZIP codes your crews can reach and the kinds of jobs that need you.
- Sort by size. Start with the biggest jobs of the week, then the builders with several open projects.
- Call within days. Builders line up their subs early, so a call in the first week has the best chance.
- Log every call. The builder, the job, the date and the next step, in a spreadsheet or a CRM.
- Call again on the next permit. When the same builder files a new permit, you have a reason to call back.
Half an hour every Monday with the week's new permits beats a month of cold calls from an old list.
What to say
Keep it short, and make it about their job:
"Hi, this is [your name] with [your company]. I saw the permit for the new building at [address]. Are you still taking [your trade] bids on that one? We are close by and can get you a number this week."
Name the job, ask one question, give one reason to say yes. If they already have someone, ask what they are building next.
Mistakes that waste a list
- Calling too late. For the early trades, a permit from three months ago is old news.
- Calling the owner. The builder decides who does the work.
- Treating every permit the same. A re-roof and a forty-unit building are different calls. Filter by type and size first.
- Ignoring the repeat builders. The busiest builders in your area are where steady work comes from.
- Working a list once. New permits arrive every day. The value is in working them every week.
Doing it with PermitLeadsHQ
We collect new building permits every morning in 27 cities, group them by job site and add the builder's phone number when the city has it: 50% of open projects have one today. Pick your trades and ZIP codes, and new projects reach your inbox once a week on the free plan, or every morning with Pro.
Start with your city's page, or see this week's biggest projects.