1208 E 52nd St Unit 206
Austin, TX 78723 Issued Jun 11, 2026 Commercial remodel
This permit is one piece of a 11-permit project.View the main permit
Declared value
Not reportedThe city gave no value
Size
565sqftThis permit only
Floors
2
Units
10
Scope of work
Replace Existing HVAC Units like for like Replace Existing Lighting Fixtures Switches and Outlets as need. Replace all Existing Countertops Cabinets Fixtures and Equipment with new. Construct Fire-Rated Partitions between Units. Convert Existing Tubs to Showers. Replace Existing Gypsum Boards. Replace Doors like-for like. Units 106 & 206 No Fire Damage. New Sheetrock will be replaced at the Partition Wall. (4) Applications for Unit 106 107 206 207
Permit timeline
- AppliedDec 2, 2025191 days in review
- IssuedJun 11, 20264mo ago
- ExpiresMar 29, 2027in 167 days
Details
- Project type
- Commercial remodel
- Work class
- Remodel
- Sector
- Commercial
- Permit type
- Building Permit
- Council district
- 4
- ZIP code
- 78723
- Status
- Active
- Permit no.
- 2025-161262 BP
All permits in this project 11
Remodel
1208 E 52nd St Unit 106Replace Existing HVAC Units like for like Replace Existing Lighting Fixtures Switches and Outlets as need. Replace all Existing Countertops Cabinets Fixtures and Equipment with new. Construct Fire-Rated Partitions between Units. Convert Existing Tubs to Showers. Replace Existing Gypsum Boards. Replace Doors like-for like. Units 106 & 206 No Fire Damage. New Sheetrock will be replaced at the Partition Wall. (4) Applications for Unit 106 107 206 207
4mo ago · 565 sqft
MAIN PERMIT
Remodel
1208 E 52nd St Unit 208Renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C)
3mo ago · 720 sqft
Remodel
1208 E 52nd St Unit 209Renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C)
3mo ago · 720 sqft
Remodel
1208 E 52nd St Unit 210Renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C)
3mo ago · 720 sqft
Remodel
1208 E 52nd St Unit 108Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
3mo ago · 720 sqft
Remodel
1208 E 52nd St Unit 109Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
3mo ago · 720 sqft
Remodel
1208 E 52nd St Unit 110Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
3mo ago · 720 sqft
Remodel
1208 E 52nd St Unit HvacRenovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
3mo ago · 720 sqft
Remodel
1208 E 52nd St Unit 107Replace Existing HVAC Units like for like Replace Existing Lighting Fixtures Switches and Outlets as need. Replace all Existing Countertops Cabinets Fixtures and Equipment with new. Construct Fire-Rated Partitions between Units. Convert Existing Tubs to Showers. Replace Existing Gypsum Boards. Replace Doors like-for like. Units 106 & 206 No Fire Damage. New Sheetrock will be replaced at the Partition Wall. (4) Applications for Unit 106 107 206 207
4mo ago · 565 sqft
Remodel
1208 E 52nd St Unit 206Replace Existing HVAC Units like for like Replace Existing Lighting Fixtures Switches and Outlets as need. Replace all Existing Countertops Cabinets Fixtures and Equipment with new. Construct Fire-Rated Partitions between Units. Convert Existing Tubs to Showers. Replace Existing Gypsum Boards. Replace Doors like-for like. Units 106 & 206 No Fire Damage. New Sheetrock will be replaced at the Partition Wall. (4) Applications for Unit 106 107 206 207
4mo ago · 565 sqft
THIS PERMIT
Remodel
1208 E 52nd St Unit 207Replace Existing HVAC Units like for like Replace Existing Lighting Fixtures Switches and Outlets as need. Replace all Existing Countertops Cabinets Fixtures and Equipment with new. Construct Fire-Rated Partitions between Units. Convert Existing Tubs to Showers. Replace Existing Gypsum Boards. Replace Doors like-for like. Units 106 & 206 No Fire Damage. New Sheetrock will be replaced at the Partition Wall. (4) Applications for Unit 106 107 206 207
4mo ago · 565 sqft