11511 NE 10th St
Bellevue, WA 98004 Issued Aug 20, 2026 Tenant improvement
Declared value
$2.7M$2,728,927, whole project
Size
Not reported
Floors
Not reported
Units
Not reported
Scope of work
The scope of work is the replacement of the two large chiller units on level 5 roof, an expansion of the Boiler Room for a new Buffer Tank, replacement of all 5 pumps connected to the Chillers, and some accessory pieces of equipment that are in relation to the function of the buffer tank and pumps. Scope of work includes new chiller line runs for two new AHUs, new EPDM roofing and accessories where equipment is being installed and replaced, and the potential replacement of a small number of acoustical ceiling tiles based on the Chiller Line run on the second floor for the AHU-3B.
Permit timeline
- AppliedFeb 26, 2026175 days in review
- IssuedAug 20, 20268w ago
- ExpiresAug 19, 2029in 1036 days
Details
- Project type
- Tenant improvement
- Work class
- Nonresidential
- Sector
- Commercial
- Permit type
- Tenant improvement
- City
- Bellevue, WA
- ZIP code
- 98004
- Status
- Issued
- Permit no.
- 26 104493 BZ
All permits in this project 2
Remodel
11511 NE 10th StThe scope of work is the replacement of the two large chiller units on level 5 roof, an expansion of the Boiler Room for a new Buffer Tank, replacement of all 5 pumps connected to the Chillers, and some accessory pieces of equipment that are in relation to the function of the buffer tank and pumps. Scope of work includes new chiller line runs for two new AHUs, new EPDM roofing and accessories where equipment is being installed and replaced, and the potential replacement of a small number of acoustical ceiling tiles based on the Chiller Line run on the second floor for the AHU-3B.
8w ago
THIS PERMIT
Remodel
11511 NE 10th StThe scope of work involves two new air handler units to be installed on the level 2 and level 5 roofs, including the replacement of an existing exhaust fan with similar, the addition of a second exhaust fan unit, a new replacement of the AC unit on level 5 roof and a condenser unit for the penthouse. New interior ducts to be routed through portions of the 1st, 2nd, and 4th floor. New exterior ducts to be run from the two new air handlers. Portion of the roof will be replaced with new.
8w ago