Remodel 3 permits in this project Newest permit 3mo ago Active

73 E Lake St

Chicago, IL 60601 Issued Jun 29, 2026 Renovation / alteration

Declared value $240K$240,000, whole project
Size Not reported
Floors Not reported
Units Not reported

Scope of work

Scope of work includes selective demolition and subsequent construction of walls, ceilings, and electrical components. While the existing mechanical, fire protection, and electrical systems will primarily remain in place, modifications will be made to comply with codes and fit the new layout, including relocating HVAC diffusers, adjusting fire sprinkler heads, and adding new electrical outlets. Additionally, existing ceiling tiles and general lighting will be integrated with new grid and lighting fixtures connected to current circuits. Finishing touches will include painting the walls and installing new epoxy flooring throughout the space. (occ. Grp. A-2; const. Type 1-a)

Permit timeline

  1. AppliedJun 25, 20264 days in review
  2. IssuedJun 29, 20263mo ago
  3. StatusActiveWork in progress

Details

Project type
Renovation / alteration
Work class
Not reported
Sector
Not reported
Permit type
Renovation / alteration
City
Chicago, IL
ZIP code
60601
Status
Active
Permit no.
101084921

All permits in this project 3

Remodel 73 E Lake StScope of work includes selective demolition and subsequent construction of walls, ceilings, and electrical components. While the existing mechanical, fire protection, and electrical systems will primarily remain in place, modifications will be made to comply with codes and fit the new layout, including relocating HVAC diffusers, adjusting fire sprinkler heads, and adding new electrical outlets. Additionally, existing ceiling tiles and general lighting will be integrated with new grid and lighting fixtures connected to current circuits. Finishing touches will include painting the walls and installing new epoxy flooring throughout the space. (occ. Grp. A-2; const. Type 1-a) 3mo ago THIS PERMIT Remodel 73 E Lake StScope of work involves selective demolition and construction, updating interior finishes with new paint and flooring. While existing mechanical, electrical, fire protection, and lighting systems will remain, they will be modified, relocated, or supplemented with new outlets and fixtures as required to meet code compliance and fit the new architectural configuration. (occ. Grp. A-2 a-3 & r-2; const. Type 1-a) 3mo ago Remodel 73 E Lake StSc 2019 cbrc: scope of work involves a minor, non-structural interior renovation to update the existing fitness area and convert an adjacent theater room into a secondary fitness space. The scope includes refreshing interior finishes, painting, installing new fitness equipment, adding a non-structural wall and door in the common area, and replacing electrical outlet cover plates. All existing plumbing, fire protection, ceilings, lighting, and egress paths will remain unchanged with no impact on building occupancy. (occ. Grp. A-2 a-3 & r-2; const. Type 1-a) 3mo ago