New build 62 permits in this project Newest permit 2d ago Active

337 E Randolph St

Chicago, IL 60601 Issued Jul 23, 2026 New building

This permit is one piece of a 62-permit project.View the main permit
Declared value $4.9M$4,872,752, whole project
Size Not reported
Floors Not reported
Units Not reported

Scope of work

Permit expires on 09/23/2026 erection starts: 7/25/2026, erection ends: 8/5/2026. Nve experience agency - lolla 2026 liquid iv structurestructure- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 30x30x11.5 panel structuresetup 7/25/26- remove 8/5/26 assembly

Permit timeline

  1. AppliedJul 23, 2026Issued the same day
  2. IssuedJul 23, 20262mo ago
  3. StatusActiveWork in progress

Details

Project type
New building
Work class
Not reported
Sector
Not reported
Permit type
New construction
City
Chicago, IL
ZIP code
60601
Status
Active
Permit no.
101086189

All permits in this project 62

New build 337 E Randolph StPermit expires on 06/23/2026 erection starts: 5/14/2026, erection ends: 5/29/2026. C3 presents - sueÑos 2026 stage and structuresstage and structures- peer review, self-cert, 2 day event 5/23/2026-5/24/2026erect five (5) structures- one (1) 79x51x64, stage deck 138x60with right and left stage, left wing, and backstage, total deck area 19,864.one (1) 24x36x12 front of house, one (1) 29x26x31.5 foh spot tower, two (2) 6x6x40 delay towerssetup 5/14/2026- remove 5/29/2026assembly 5mo ago MAIN PERMIT New build 337 E Randolph StPermit expires on 12/16/2026 erection starts: 10/31/2026, erection ends: 11/1/2026. Self certification Cbc 2019. Reinst of 2022 permit 100992707 for the 2026 hot chocolate Chicago stages at grant park - butler field on nov 1, 2026. Set-up oct 31 and takedown nov 1, 2026. Same 2-24x16 mobile stages. Ventures endurance events LLC with sesg 2d ago New build 337 E Randolph StPermit expires on 12/13/2026 erection starts: 10/28/2026, erection ends: 11/2/2026. 2026 hot chocolate 15k/5k Chicago - small tentstent- reinstate 101075054- self cert- 1 day event 11/1/2026erect eleven (11) structures- one (1) 10x70 frame tent, one (1) 10x80 frame tent, one (1) 20x30 frame tent, one (1) 20x50 frame tent, three (3) 30x50 (9mx15m) structure tent, two (2) 30x82 (9mx25m) structure tent, one (1) 40x82 (12m x 25m) structure tent, one (1) 50x50 (15mx15m) structure tent.erect 10/28/2026- remove 11/2/2026assembly 5d ago New build 337 E Randolph StPermit expires on 12/13/2026 erection starts: 10/28/2026, erection ends: 11/2/2026. Erection starts: 10/28/2026, erection ends: 11/2/2026. Erection starts: 10/28/2026, erection ends: 11/2/2026. 2026 hot chocolate 15k/5k Chicago - large tentstent- peer review- reinstate 101061090 - 1 day event 11/1/2026erect two (2) structures- one (1) 40x115 (12mx35m) structure tent, one (1) 40x263(12mx80m) structure tent.erect 10/28/2026- remove 11/2/2026assembly 5d ago New build 337 E Randolph StPermit expires on 11/22/2026 erection starts: 9/24/2026, erection ends: 10/16/2026. Chicago marathon large tentstents- peer review- self-cert, 1 day event october 11, 2026erect eleven (11) structures, one (1) 20x210 structure, one (1) 30x150 structure, one (1) 30x200 structure, one (1) 40x148 structure, one (1) 40x180 structure, one (1) 50x150 structure, one (1) 60x100 pole, one (1) 66x312 structure, one (1) 82x100 structure, one (1) 82x214 structure, and one (1) 100x250 pole. Setup 9/24/2026- remove 10/16/2026assembly 3w ago New build 337 E Randolph StPermit expires on 11/09/2026 erection starts: 9/24/2026, erection ends: 10/16/2026. Chicago marathon small tentstents- self-cert, 1 day event october 11, 2026erect thirty-one (31) structures, one (1) 10x30 frame, one (1) 16x15 frame, one (1) 20x20 frame, eight (8) 20x30 frame, three (3) 20x40 frame, one (1) 20x60 frame, one (1) 20x80 structure, one (1) 20x140 structure, one (1) 30x20 structure, one (1) 30x30 frame, one (1) 30x40 structure, two (2) 30x60 frame, three (3) 30x60 structure, one (1) 30x70 frame, one (1) 30x90 structure, one (1) 40x40 structure, one (1) 40x50 structure, one (1) 40x60 structure, and one (1) 40x90 structure. Setup 9/24/2026- remove 10/16/2026, assembly 5w ago New build 337 E Randolph StPermit expires on 11/09/2026 erection starts: 9/24/2026, erection ends: 10/16/2026. Chicago marathon stage structuresstages- reinstate permit 101073740 self-cert, 1 day event october 11, 2026erect two (2) structures, one (1) 20x20x3 bil-jax stage, and one (1) 20x80x3 with 16x24x3 bumpout start line bil-jax stage..setup 9/24/2026- remove 10/16/2026assembly 5w ago New build 337 E Randolph StPermit expires on 11/09/2026 erection starts: 9/24/2026, erection ends: 10/16/2026. Chicago marathon box truss structuresstructures- peer review- reinstate 101073748, self-cert, 1 day event october 11, 2026erect three (3) structures, one (1) 65x7x19.5 start line box truss, 54x12x15.5 finish line led box truss, 52x24x18.5 platform and box truss.setup 9/24/2026- remove 10/16/2026assembly 5w ago New build 337 E Randolph StPermit expires on 11/09/2026 erection starts: 10/7/2026, erection ends: 10/12/2026. Chicago marathon photo bridge boom towerstructures- peer review- reinstate 101060270 self-cert, 1 day event october 11, 2026erect two (2) structures- one (1) 16x12x8 boom tower platform, one (1) - 54x16x22.75 photo bridgesetup 10/7/2026- remove 10/12/2026assembly 5w ago New build 337 E Randolph StPermit expires on 11/09/2026 erection starts: 10/7/2026, erection ends: 10/12/2026. Chicago marathon bleachersstructures- self-cert, reinstate 101060266 1 day event october 11, 2026erect two (2) structures- one (1) 84x13.5x9.5 bleacher, one (1) 132x13.5x14.5 bleachersetup 10/7/2026- remove 10/12/2026assembly 5w ago New build 337 E Randolph StPermit expires on 11/09/2026 erection starts: 10/7/2026, erection ends: 10/12/2026. Chicago marathon mobile bleachersmobile bleachers- self-cert, 1 day event october 11, 2026erect eight (8) 39.75x17.3x11 mobile bleacherssetup 10/6/2026- remove 10/12/2026assembly 5w ago New build 337 E Randolph StPermit expires on 11/09/2026 erection starts: 9/24/2026, erection ends: 10/16/2026. Chicago marathon box truss structurestructure, self-cert,1 day event october 11, 2026erect one (1) 5 x7.x 17 12" box truss tower structuresetup 9/24/2026- remove 10/16/2026assembly 5w ago New build 337 E Randolph StPermit expires on 10/13/2026 erection starts: 8/27/2026, erection ends: 8/31/2026. Self cert Cbc 2019 - 2026 panda fest Chicago stage and tents at butler field on aug 28-30, 2026. Setup aug 27 and takedown aug 31, 2026. 1-sl100 mobile stage with wings and five 40x40 tents. Csem with dragonfest LLC 2mo ago New build 337 E Randolph StPermit expires on 09/29/2026 erection starts: 7/24/2026, erection ends: 8/3/2026. C3 live nation - lolla 2026 hollister structurestructure- peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 40"x29"x16" modified cargo containers, framed structuresetup 7/24/26- remove 8/3/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/29/2026 erection starts: 7/24/2026, erection ends: 8/4/2026. C3 live nation - lolla 2026 neutrogena structurestructure- peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 20x30x12 box truss structure 32x32 foot printsetup 7/24/26- remove 8/4/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/29/2026 erection starts: 7/24/2026, erection ends: 8/4/2026. C3 live nation - lolla 2026 ulta structurestructure- peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 40"x36.5'x16.75' modtruss structure (40x40 foot print)setup 7/24/26- remove 8/4/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/28/2026 erection starts: 7/28/2026, erection ends: 8/4/2026. Reach - lolla 2026 toyota box truss structure- peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 66x10x22 box truss structuresetup 7/28/26- remove 8/4/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/24/2026 erection starts: 7/23/2026, erection ends: 8/9/2026. C3 presents lollapalooza ADA platformsplatform - self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect two (2) platforms- one (1) 40x24 ADA platform, one (1) 48x32 ADA platformsetup 7/23/2026 remove 8/9/2026assembly 2mo ago New build 337 E Randolph StPermit expires on 09/24/2026 erection starts: 7/24/2026, erection ends: 8/9/2026. C3 presents lollapalooza perry suitesstructure -peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect two (2) structures- two (2) 8x20x18 double stack modified container structures.setup 7/24/2026 remove 8/9/2026assembly 2mo ago New build 337 E Randolph StPermit expires on 09/24/2026 erection starts: 7/27/2026, erection ends: 8/3/2026. C3 live nation - lolla 2026 lol surprise structurestructure- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 24x20 x12 modified cargo container structuresetup 7/27/26- remove 8/3/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/24/2026 erection starts: 7/24/2026, erection ends: 8/3/2026. The bait shoppe - lolla 2026 bud lightstructure- peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 8x20x9.3 cargo contain with second level, one (1) 4x7x20 marquee signsetup 7/24/26- remove 8/3/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/21/2026, erection ends: 8/9/2026. C3 presents lollapalooza perry stage and entry structurestage structures- reinstate 101021810 peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect six (6) structures- one (1) 47.6x8x19.5 entry scaffold structure, one (1) 62x48x58.5 stage total deck 120x48 with right and left stage, right wing loading, one (1) 24x36x12 front of house, one (1) 29x26x31.5 foh spot structure, and two (2) 6.5x6x40 delay towers structuressetup 7/21/2026 remove 8/9/2026assembly 2mo ago New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/24/2026, erection ends: 8/4/2026. C3 live nation - lolla 2026 casa bacardistructure- peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 40x 43.33'x 29' 2 story box truss structure.setup 7/24/26- remove 8/4/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/24/2026, erection ends: 8/5/2026. Lollapalooza - coke cola studio structurestructure- reinstate 101056076, peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 48'x48'x22' structure (foot print) 1940SF, 40' dia 20.5 box truss on 6 stl. Posts. Setup 7/24/2026 - remove 8/5/2026assembly 2mo ago New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/27/2026, erection ends: 8/3/2026. Lollapalooza - coke lounge structure structure- reinstate 101071862, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 43 x27 x 13' 20.5 box truss structure.setup 7/27/2026 - remove 8/3/2026assembly 2mo ago New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/24/2026, erection ends: 8/3/2026. C3 live nation - lolla 2026 gildan comfort colors structurestructure- peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 37.33 x20 x 15 modified shipping container structuresetup 7/24/26- remove 8/3/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/24/2026, erection ends: 8/4/2026. C3 live nation - lolla 2026 patron structure two story structurestructure- reinstate 101071860, peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 36.5x 40.5'x 23.5' 2 story structure. Setup 7/24/26- remove 8/4/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/24/2026, erection ends: 8/3/2026. Black ops production- lolla 2026 google structure- peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 24x24x11 box truss structure with shade sail (over all 53x32) 1392 SF setup 7/24/26- remove 8/3/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/25/2026, erection ends: 8/5/2026. Nve experience agency - lolla 2026 liquid iv structurestructure- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 30x30x11.5 panel structuresetup 7/25/26- remove 8/5/26 assembly 2mo ago THIS PERMIT New build 337 E Randolph StPermit expires on 09/23/2026 erection starts: 7/27/2026, erection ends: 8/3/2026. Corso millner group- lolla 2026 red bull trussstructure- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) 36x20x18 truss structuresetup 7/27/26- remove 8/3/26 assembly 2mo ago New build 337 E Randolph StPermit expires on 09/21/2026 erection starts: 7/15/2026, erection ends: 8/8/2026. C3 presents lollapalooza quest small tentstent- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect forty-three (43) structures- there (3) 10x50 frame, six (6) 10x60 frame, four (4) 20x30 frame, six (6) 20x40 frame, two (2) 20x50 frame, eight (8) 20x60 frame, two (2) 20x80 frame, one (1) 20x80 (6mx24m) structure, one (1) 20x120 frame, one (1) 20x120 (6mx36m) structure, two (2) 30x30 (9mx9m) structure, one (1) 30x60 (9mx18m) structure, one (1) 30x100 (9mx30m) structure, one (1) 40x20 (12mx6m) structure, two (2) 60x33 (18mx10m) structure, one (1) 66x33 (20mx10m) structure, one (1) 66x50 (20mx15m) structure.setup 7/15/2026 remove 8/8/2026assembly 2mo ago New build 337 E Randolph StPermit expires on 09/21/2026 erection starts: 7/15/2026, erection ends: 8/8/2026. C3 presents lollapalooza quest large tentstent- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect seven (7) structures- one (1) 20x210 (6mx63m) structure, one (1) 20x220 (6mx66m) structure, one (1) 20x260 (6mx78m) structure, one (1) 20x290 (6mx87m) structure, one (1) 30x200 (9mx60m) structure, one (1) 50x82 (15mx25m) structure, one (1) 66x200 (20mx60m) structure. Setup 7/15/2026 remove 8/10/2026assembly 2mo ago New build 337 E Randolph StPermit expires on 09/20/2026 erection starts: 7/23/2026, erection ends: 8/9/2026. C3 presents lolla lakeshore stagestage -peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) structure- one (1) 60x40x65 stage with 31x40 stage right and left and 12x120 upstage, total deck 6320SF.setup 7/23/2026 remove 8/9/2026assembly 3mo ago New build 337 E Randolph StPermit expires on 09/20/2026 erection starts: 7/15/2026, erection ends: 8/8/2026. C3 presents lollapalooza proem small tentstent- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect forty-six (46) structures- one (1) 10x50 frame, four (4) 10x60 frame, one (1) 10x60 (3mx18m) structure, one (1) 10x80 frame, one (1) 10x80 (3mx24m) structure, one (1) 10x100 frame, one (1) 10x110 frame, one (1) 16x32 frame, one (1) 16x72 frame, two (2) 20x30 frame, eleven (11) 20x40 frame, one (1) 20x40 (6mx12m) structure, four (4) 20x60 frame, four (4) 20x60 (6mx18m) structure, one (1) 20x80 frame, one (1) 20x90 (6mx27m) structure, one (1) 30x40 (9mx12m) structure, one (1) 30x60 (9mx18m) structure, one (1) 30x120 (9mx36m) structure, two (2) 40x20 (12mx6m) structure, three (3) 40x60 (12mx18m) structure, one (1) 50x50 (15mx15m) structure, one (1) 66x41 (20mx12.5m) structure.setup 7/15/2026 remove 8/8/2026assembly 3mo ago New build 337 E Randolph StPermit expires on 09/20/2026 erection starts: 7/15/2026, erection ends: 8/8/2026. C3 presents lollapalooza proem large tentstent- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect three (3) structures- one (1) 33x264 (10mx80m) structure, one (1) 50x82 (15mx82m) structure, one (1) 82x100 (25mx30m) structure. Setup 7/15/2026 remove 8/8/2026assembly 3mo ago New build 337 E Randolph StPermit expires on 09/15/2026 erection starts: 7/20/2026, erection ends: 8/9/2026. C3 presents lollapalooza main stages and structuresstage structures- reinstate 101021805 peer review, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect twelve (12) structures- one (1) 64x80x82 stage total deck 148x80 with right and left stage, and backstage, one (1) 80x80x82 stage total deck 248x80 with right and left stage, left wing, and backstage, two (2) 24x32x12 front of house, six (6) 6.5x6x40 delay tower structures, two (2) 22x22x54 spot tower structure. Setup 7/20/2026 remove 8/9/2026assembly 3mo ago New build 337 E Randolph StPermit expires on 09/15/2026 erection starts: 7/24/2026, erection ends: 8/9/2026. C3 presents lollapalooza mobile stagesmobile stages- self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect three (3) mobile stages- two (2) 24x20x24 sl100 mobile stages with stage right and stage left wings 8x4, one (1) 50x40x45 sam555 mobile stages with stage right and stage left wings 20x40.setup 7/24/2026 remove 8/9/2026assembly 3mo ago New build 337 E Randolph StPermit expires on 09/15/2026 erection starts: 7/27/2026, erection ends: 8/9/2026. C3 presents lollapalooza info towerstructure -reinstate 101054928, self-cert, 4 day event (july 30, 2026 - august 2, 2026)erect one (1) structure- one (1) 10.4 x10.4 x16.6 video wall cubesetup 7/27/2026 remove 8/9/2026assembly 3mo ago New build 337 E Randolph StPermit expires on 09/15/2026 erection starts: 7/15/2026, erection ends: 8/9/2026. C3 presents lollapalooza - inproduction platformsplatforms- self-cert- 4 day event 7/30/26 " 8/2/26erect sixteen (16) platform structures- one (1) 265x50 platform, one (1) 200x37 platform, one (1) 200x70 platform, one (1) 45x30 platform, one (1) 90x100 platform, one (1) 70x60 platform, one (1) 70x40 platform, one (1) 52x85 platform, one (1) 40x20 platform, one (1) 33x82 (10mx25m) mezzanine structure, one (1) 100x37 platform, one (1) 32x32 platform, one (1) 20x25 platform (stage), one (1) 33x66 (10mx20m) mezzanine, one (1) 22x62 platform, and one (1) 170x15 platform.setup 7/15/2026- remove 8/9/2026, assembly 3mo ago New build 337 E Randolph StPermit expires on 08/29/2026 erection starts: 6/29/2026, erection ends: 7/15/2026. Self-cert Cbc 2019. Multiple tents for the 2026 taste of Chicago on july 8-12 2026 at grant park. Set-up is june 29 and takedown by july 15, 2026. 2-50x33 tents, 5-20x30 tents, 1-30x40 tent, 2-40x60 tents and 4-30x20 tents, 1-30x50 tent and 1-15x120 tent. Dcase with big tent events 3mo ago New build 337 E Randolph StPermit expires on 08/09/2026 erection starts: 6/22/2026, erection ends: 6/29/2026. All of us " butler field grant park 2026structures- self-cert- 2 day event (6/26-27/2026)erect nineteen (19) structures, one (1) 80x48 platform/dj platform, three (3) 54x12x20 light box trusses, four (4) 4x4x20 light gt truss towers, two (2) 45x13x23 light/video box trusses, two (2) 14x14x37 audio box truss towers, seven (7) 20x8x22 stacked cargo containers, setup 6/22/2026 remove 6/29/2026, assembly 4mo ago New build 337 E Randolph StPermit expires on 07/29/2026 erection starts: 6/12/2026, erection ends: 6/15/2026.self cert. Cbc 2019 - the collective futures project stage event in grant park butler field on june 14, 2026. Set-up is june 12, and takedown is june 15, 2026. 1-32x24 sl250 mobile stage with thrust. Patinos music LLC 4mo ago New build 337 E Randolph StPermit expires on 07/20/2026 erection starts: 5/21/2026, erection ends: 5/26/2026. Suenos toyota den box truss structure. Structural- peer review, self-cert- 2 day event 5/23/2026-5/24/2026 erect one (1) 54ft.x10ft. X22ft. Box truss structure setup 5/21/26- remove 5/26/26 assembly 5mo ago New build 337 E Randolph StPermit expires on 07/19/2026 erection starts: 5/31/2026, erection ends: 6/9/2026. Pokemon go 2026structures- self-cert, 3 day event june 5-7, 2026erect three(3) structures, one(1) 17.5x24.5 inflatable, one(1) 11x9.5x15.75 conservatory panel structure, one(1) 12' dia. X 18.5 gym box truss structure setup 5/31/26- remove 6/9/26, assembly 5mo ago New build 337 E Randolph StPermit expires on 07/19/2026 erection starts: 5/31/2026, erection ends: 6/9/2026. Pokemon go 2026tents- self-cert, 3 day event june 5-7, 2026erect three (3) 60x68 (18mx21m) saddlespan canopy (3014SF)setup 5/31/26- remove 6/9/26, assembly 5mo ago New build 337 E Randolph StPermit expires on 07/18/2026 erection starts: 5/31/2026, erection ends: 6/9/2026. Pokemon go 2026tents- 3 day event june 5-7, 2026 erect five(5), two(2) 20x30 (6mx9m) structure, one(1) 20x50 frame, one(1) 20x60 frame, one(1) one 40x50 (12mx15m) structuresetup 5/31/26- remove 6/9/26, assembly 5mo ago New build 337 E Randolph StPermit expires on 07/14/2026 erection starts: 5/31/2026, erection ends: 6/9/2026. Pokemon go 2026tent- 3 day event june 5-7, 2026erect one 40x217 (12mx66m) structuresetup 5/31/26- remove 6/9/26, assembly 5mo ago New build 337 E Randolph StPermit expires on 07/13/2026 erection starts: 5/19/2026, erection ends: 5/26/2026. Erection starts: 5/19/2026, erection ends: 5/26/2026. Suenos tito's structurestructure- self-cert- 2 day event 5/23/2026-5/24/2026erect one (1) 29.75x29.75x14 post beam and box truss structuresetup 5/19/26- remove 5/26/26 assembly 5mo ago New build 337 E Randolph StPermit expires on 07/08/2026 erection starts: 5/18/2026, erection ends: 5/27/2026. C3 presents - sueÑos 2026 - casa bacardistructure- peer review- self-cert- 2 day event- 5/23/2026-5/24/2026erect one (1) 42x 43.33'x 29' 2 story box truss structure.setup 5/18/2026- remove 5/27/2026assembly 5mo ago New build 337 E Randolph StPermit expires on 07/08/2026 erection starts: 5/20/2026, erection ends: 5/26/2026. C3 presents - sueÑos 2026 - corona mobile structuremobile structure- peer review- self-cert- 2 day event may 23 - 24, 2026erect one (1) 57.3x21.96 double level mobile structure, ground level 890SF, upper level 1045sfsetup 5/20/2026- remove 5/26/2026assembly 5mo ago New build 337 E Randolph StPermit expires on 06/29/2026 erection starts: 5/21/2026, erection ends: 5/24/2026. C3 presents - sueÑos 2026 mobile stage sl100mobile stage- self-cert- 2 day event- 5/23/2026-5/24/2026erect one (1) structures- one (1) stageline sl100 24x20 mobile stagesetup 5/21/2026- remove 5/24/2026assembly 5mo ago New build 337 E Randolph StPermit expires on 06/28/2026 erection starts: 5/13/2026, erection ends: 5/30/2026. C3 presents - sueÑos 2026 - inproductionplatform structures- peer review- self-cert- 2 day event- 5/23/2025-5/24/2026erect five (5) platforms- one (1) 85x60 platform, one (1) 32x42 platform, one (1) 22x22 platform, one (1) 32x22 platform, one (1) 52x50 platformsetup 5/13/2026- remove 5/30/2026assembly 5mo ago New build 337 E Randolph StPermit expires on 06/28/2026 erection starts: 5/13/2026, erection ends: 5/29/2026. C3/quest- sueÑos 2026 - small tentsstructure- peer review- self-cert- 2 day event- 5/23/2026-5/24/2026erect fifty-one (51) structures- two (2) 10x10 frame, two (2) 10x20 frame, five 10x50 frame, four (4) 10x60 frame, one 10x80 frame, one (1) 10x315 structure, two (2) 20x20 frame, four (4) 20x3three (3) 20x80 structure, 0, six (6) 20x40, one (1) 20x40 structure, one (1) 20x50, three (3) 20x60 frame, three (3) 20x80 frame, one (1) 20x100 structure, two (2) 20x180 structure, one (1) 30x30 frame, one (1) 30x30 structure, one (1) 30x60 structure, one (1) 30x80 structurepi8 5mo ago New build 337 E Randolph StPermit expires on 06/28/2026 erection starts: 5/13/2026, erection ends: 5/29/2026. C3/quest- sueÑos 2026 - large tentsstructure- peer review- self-cert- 2 day event- 5/23/2026-5/24/2026erect three (3) structures- one (1) 40x130 (12mx39m) structure, one (1) 66x100 (20mx30m) structure, one (1) 82x50 (25mx15m) structure. Setup 5/13/26- remove 5/29/26assembly 5mo ago New build 337 E Randolph StPermit expires on 06/28/2026 erection starts: 5/19/2026, erection ends: 5/26/2026. Suenos jim beam box truss structure- peer review, self-cert- 2 day event 5/23/2026-5/24/2026erect one (1) 30x30x15 box truss structuresetup 5/19/26- remove 5/26/26 assembly 5mo ago New build 337 E Randolph StPermit expires on 06/24/2026 erection starts: 5/10/2026, erection ends: 5/16/2026. Self cert. Cbc 2019. Reinstatement of 2023 permit 101014811 for the same large 1-40x160 tent and location for the 2026 jp morgan chase corporate challenge at grant park on may 14 2026. Setup may 10 and takedown may 16 2026. Lakeshore athletic services, inc 5mo ago New build 337 E Randolph StPermit expires on 06/24/2026 erection starts: 5/11/2026, erection ends: 5/16/2026. Self cert. Cbc 2019 - 38 small tents and 2 platforms for the 2026 jp morgan corporate challenge on may 14, 2026. Set-up is may 11 and takedown on may 16, 2026. The 38 small tent sizes are 1-10x100, 1-30x60, 1-30x40, 1-20x30, 11-40x40, 11-30x30, and 12-20x40 tents with 1-12x24 platform and 1-12x16 platform. Lakeshore athletic services, inc 5mo ago New build 337 E Randolph StPermit expires on 06/23/2026 erection starts: 5/19/2026, erection ends: 5/24/2026. C3 presents - sueÑos 2026 mobile stage sl260mobile stage structures- self-cert- 2 day event- 5/23/2026-5/24/2026erect one (1) structures- one (1) 32x24 sl260 mobile stage with 8x8 wingssetup 5/19/2026- remove 5/24/2026assembly 5mo ago New build 337 E Randolph StPermit expires on 06/23/2026 erection starts: 5/21/2026, erection ends: 5/24/2026. C3 presents - sueÑos 2026 mobile stage sl100mobile stage- reinstate 101068118, self-cert- 2 day event- 5/23/2026-5/24/2026erect one (1) structures- one (1) stageline sl100 24x20 mobile stage with 8x8 wingssetup 5/21/2026- remove 5/24/2026assembly 5mo ago New build 337 E Randolph StPermit expires on 06/23/2026 erection starts: 5/19/2026, erection ends: 5/25/2026. C3 presents - sueÑos 2026 arches inflatable structures- reinstate 101049430- self-cert- 2 day event- 5/23/2026-5/24/2026erect three (3) 26x43 arch entry portal inflatable foot printsetup 5/19/2026- remove 5/25/2026assembly 5mo ago New build 337 E Randolph StPermit expires on 06/23/2026 erection starts: 5/17/2026, erection ends: 5/30/2026. C3 presents - sueÑos 2026- ADA platformstructure- reinstae 101067822, self-cert- 2 day event- 5/23/2026 - 5/24/2026 erect one (1) 32'x20'x5' ADA platformsetup 5/17/2026- remove 5/30/2026assembly 5mo ago New build 337 E Randolph StPermit expires on 06/23/2026 erection starts: 5/16/2026, erection ends: 5/17/2026. Self cert - Cbc 2019. Chicago spring half marathon 2026 stage on may 17 at butler field in grant park. Set-up is may 16 and takedown is may 17 after the event. 1-24 x 20 mobile stage with wings. Lifetime with hrp Chicago LLC 5mo ago