221 W 6th Ave
Mesa, AZ 85210 Issued Jun 15, 2026 Tenant improvement
This permit is one piece of a 3-permit project.View the main permit
Declared value
$6.2M$6,222,018, whole project
Size
Not reported
Floors
Not reported
Units
Not reported
Scope of work
Demolition interior building elements including partition walls, mechanical ducts, underfloor and above floor plumbing, concrete slab, electrical distribution, ceilings and selective structural demo.
Permit timeline
- AppliedMay 18, 202628 days in review
- IssuedJun 15, 20264mo ago
- StatusIssuedWork in progress
Details
- Project type
- Tenant improvement
- Work class
- Tenant Improvement (Interior Only)
- Sector
- Commercial
- Permit type
- Commercial Permit
- Council district
- 4
- ZIP code
- 85210
- Status
- Issued
- Permit no.
- PMT26-09681
All permits in this project 3
New build
221 W 6th AveTenant improvement of existing 28,275 SF type VB construction group E, A3 B and S1 occupancy Boys and Girls Club. Modification of approx. 13,000 SF existing space to include new walls and doors to create various education rooms, admin offices, new reception area, and restroom facilities. Main Gym is separated from remainder of bldg by existing 2hr fire wall. Scope includes building addition of 2,918 SF to provide secure lobby, conference and additional education space. Associated MEP scope: mech new duct distribution from existing / relocated units, plumbing for new restroom facility, elect with new lighting, power, and new distribution with existing service. Results in CoO. Special inspection req. concrete, epoxy anchor. Deferred - Prefabricated Trusses. Deferred fire sprinklers and fire alarm. Results in CoO.
2mo ago · 28,275 sqft
MAIN PERMIT
Remodel
221 W 6th AveDemo windows and portion of CMU wall in existing building. Infill masonry wall. Remove one existing RTU to be reused on future phase and one existing RTU to remain in place. Install new RTU in place of removed existing RTU. Store removed existing RTU on sleepers next to new RTU. Remove identified return and supply air ducts. Install new supply, return, and exhaust air ducts. New plenum above exhaust grille. New water supply lines for 3-comp sink, prep sink and hand wash sink. New waste line for new floor sinks. New kitchen equipment. Special inspections required: epoxy anchors, masonry construction, and post-installed anchors. Deferred fire sprinklers and fire alarm. Results in CofC.
4mo ago
COMPLETED
Remodel
221 W 6th AveDemolition interior building elements including partition walls, mechanical ducts, underfloor and above floor plumbing, concrete slab, electrical distribution, ceilings and selective structural demo.
4mo ago
THIS PERMIT