401 South End Avenue
New York, NY 10280 Issued Jul 2, 2026
This permit is one piece of a 6-permit project.View the main permit
Declared value
$532M$532,291,250, whole project
Size
111,935sqftThis permit only
Floors
1
Units
Not reported
Scope of work
Reach 6 - The FBS includes micropile-founded T-walls, L-walls, founded closure gates at street crossings (roller gates at Thames, Rector, Albany), stoplogs for Gateway Plaza pool access, & an integral tide gatewell...
Permit timeline
- AppliedJul 1, 202512 months to issue
- IssuedJul 2, 20263mo ago
- ExpiresNov 1, 2026in 18 days
Details
- Project type
- Alteration
- Work class
- General construction
- Sector
- Not reported
- Permit type
- Alteration
- Council district
- 1
- ZIP code
- 10280
- Status
- Issued
- Permit no.
- M01238963-S1-GC-CX
All permits in this project 6
Remodel
401 South End AvenueReach 5 - filing for Earthwork/ Construction of a flood barrier system and two bridging structures for the BPCA North/West Battery Park City Resiliency project.
5mo ago · 189,626 sqft
MAIN PERMIT
Remodel
401 South End AvenueSt/fo work for reach 2 - construction of a platform consisting of precast/prestressed voided decks with a topping slab spanning 42-ft on average on drilled shaft supported bents. See comments below.
3mo ago · 34,100 sqft
Remodel
401 South End AvenueEarthwork for Reach 2 - this scope involves excavation, grading, landscaping soil improvement per plans. Adding and compacting fillto stabilize the site with erosion cont. Stabilizing foundation of adjacent structures.
3mo ago · 34,100 sqft
Remodel
401 South End AvenueReach 6-New flood wall constr. for NWBPCR project. Scope includes excavation, grading, landscaping, soil improvement. Add & compact fill to stabilize site with erosion cont. Stabilize foundations of adj. structures...
3mo ago · 111,935 sqft
Remodel
401 South End AvenueReach 6 - The FBS includes micropile-founded T-walls, L-walls, founded closure gates at street crossings (roller gates at Thames, Rector, Albany), stoplogs for Gateway Plaza pool access, & an integral tide gatewell...
3mo ago · 111,935 sqft
THIS PERMIT
Remodel
401 South End AvenueStructural/Foundation work for Reach 5 - Construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project.
4mo ago · 189,626 sqft