1390 Carrizo Gorge Rd Substation
Jacumba, CA 91934 Issued Apr 30, 2026 Industrial building
Declared value
$13M$13,042,920, whole project
Size
11,910sqftThis permit only
Floors
Not reported
Units
Not reported
Scope of work
Switchyard for "carrizo gorge switchyard" at "jacumba valley ranch (jvr) energy park" to include: 11,910 sqft (1191 lf, max height 10 ft) fence (3) 138 kv overhead bays (3) 138 kv circuit breakers (12) 138 kv switches (2) 138 kv ssvt's 1280 sqft 138 kv transmission control shelter w/ battery racks, misc epm 04/28/2026: plan change. See 03/02/2026 plan change condition for details. EP 3/2/26 plan change see coa ala 12/12/25 pc extension at 25% of the current rate okay to issue in pc invalid status until 4/9/2026 07/17/2025: (5) 180 day extension�s granted � ok to issue permit with pc invalid expired status until 10/11/2025. EP
Permit timeline
- AppliedApr 25, 202248 months to issue
- IssuedApr 30, 20265mo ago
- StatusIssuedWork in progress
Details
- Project type
- Industrial building
- Work class
- New Primary Comm Structure
- Sector
- Commercial
- Permit type
- Industrial Bldgs
- City
- Jacumba, CA
- ZIP code
- 91934
- Status
- Issued
- Permit no.
- PDS2022-COMPRI-000028
All permits in this project 2
New build
1390 Carrizo Gorge Rd SubstationSwitchyard for "carrizo gorge switchyard" at "jacumba valley ranch (jvr) energy park" to include: 11,910 sqft (1191 lf, max height 10 ft) fence (3) 138 kv overhead bays (3) 138 kv circuit breakers (12) 138 kv switches (2) 138 kv ssvt's 1280 sqft 138 kv transmission control shelter w/ battery racks, misc epm 04/28/2026: plan change. See 03/02/2026 plan change condition for details. EP 3/2/26 plan change see coa ala 12/12/25 pc extension at 25% of the current rate okay to issue in pc invalid status until 4/9/2026 07/17/2025: (5) 180 day extension�s granted � ok to issue permit with pc invalid expired status until 10/11/2025. EP
5mo ago · 11,910 sqft
THIS PERMIT
Solar
1390 Carrizo Gorge Rd SubstationInstallation of renewable energy storage substation, 600 sqft detached control shelter for "jacumba hot springs" 5/22/2026: plan change, see conditions of approval for details. - ad 4/9/26: updated plan change condition to reflect deferred submittal. Kp 02/23/2026: plan change. See coa for details. EP 12/10/2025: (1) 180 day extension�s granted � ok to issue permit with pc invalid expired status until 05/03/2026. EP 07/17/2025: (5) 180 day extension�s granted � ok to issue permit with pc invalid expired status until 11/04/2025. EP
6mo ago