627 E 60th St
Tacoma, WA 98404 Issued Apr 27, 2026 Apartment building
Declared value
$10.3M$10,310,707, whole project
Size
Not reported
Floors
Not reported
Units
48
Scope of work
PRIORITY - Construct 48-unit, - 45,5695 SF, - 2 Story, - VB Construction affordable housing Apartment building. Field Revision #1 FRC26-0170 (06.12.26): Reduced number of shear walls for efficiency. Added straps at reentrant corners. Field Revision #2 FRC26-0179 APPROVED 6.16.26 Revision to the utility rooms to add a dedicated fire pump room. Relocation of the electrical panel at the laundry rooms. Revision to wall tags at the elevator shaft to align with the code compliance form. FRC26-0235 (08.21.26): change of the structural material at the corridor on levels 2 & 3 from Mass Plywood Panels (MPP) to Cross Laminated Timber (CLT)
Permit timeline
- AppliedSep 25, 2025214 days in review
- IssuedApr 27, 20265mo ago
- StatusIssuedWork in progress
Details
- Project type
- Apartment building
- Work class
- Not reported
- Sector
- Commercial
- Permit type
- Commercial New Building
- City
- Tacoma, WA
- ZIP code
- 98404
- Status
- Issued
- Permit no.
- BLDCN25-0046
All permits in this project 3
New build
627 E 60th StPRIORITY - Construct 48-unit, - 45,5695 SF, - 2 Story, - VB Construction affordable housing Apartment building. Field Revision #1 FRC26-0170 (06.12.26): Reduced number of shear walls for efficiency. Added straps at reentrant corners. Field Revision #2 FRC26-0179 APPROVED 6.16.26 Revision to the utility rooms to add a dedicated fire pump room. Relocation of the electrical panel at the laundry rooms. Revision to wall tags at the elevator shaft to align with the code compliance form. FRC26-0235 (08.21.26): change of the structural material at the corridor on levels 2 & 3 from Mass Plywood Panels (MPP) to Cross Laminated Timber (CLT)
5mo ago
THIS PERMIT
New build
627 E 60th StPRIORITY - Construct - 11,211 SF, Two Story, 8 dwelling units/ VB construction townhomes. FRC26-0172 APPROVED 06/12/26 Reduced number of shear walls for efficiency. 2nd level roof on north end revised from joists to trusses. Architectural wall tags revised to align with energy code compliance forms.
5mo ago
New build
627 E 60th StPRIORITY - construct 5774SF two-story building with 4 townhomes. Plumbing and mechanical included per approved plans. FRR26-0107 APPROVED 06/12/26 Reduced number of shear walls for efficiency. 2nd level roof on west end revised from joists to trusses. Architectural wall tags revised to align with energy code compliance forms.
5mo ago