Remodel 3 permits in this project Issued

10850 NE 6th St

Bellevue, WA 98004 Issued Jun 24, 2026 Tenant improvement

This permit is one piece of a 3-permit project.View the main permit
Declared value $632K$632,432, whole project
Size Not reported
Floors Not reported
Units Not reported

Scope of work

Sound Transit Stride Bus Rapid Transit (BRT) along the Interstate 405 (I-405) and State Route (SR) 518 corridor will provide service for 37 miles between Lynnwood and Burien. The Stride BRT service in this corridor would operate as two routes: a north Stride BRT line (S2) with terminal stations at the Lynnwood City Center and the Bellevue Transit Center, and a south Stride BRT line (S1) with terminal stations at the Burien Transit Center and the Bellevue Transit Center. The two routes would connect at the Bellevue Transit Center, where passengers would be able to transfer between the north and south Stride BRT lines to other bus routes and connect to Link light rail. This building permit is for proposed improvements to Bellevue Transit Center, specifically roof remodel work and other supporting elements for Bus Shelter #2 (Bus Bays 3, 4, 5, 8, 9, 10) at Bellevue Transit Center, 10804 NE 6th Street. In general, work includes: Removing and replacing portions of the existing concrete and brick platform within the transit center island; replacing existing shelter canopy light fixtures, installing pylon structure with message sign screen; touch ups to existing worn windscreens; cutting back roof edges of the transit center island; modifying existing bus bays to accommodate passenger pick up, vehicles, and install system features; installing pavers for accessible boarding zones; removal of benches, tree grates, windscreens.

Permit timeline

  1. AppliedMar 19, 202697 days in review
  2. IssuedJun 24, 20263mo ago
  3. ExpiresJun 23, 2029in 979 days

Details

Project type
Tenant improvement
Work class
Nonresidential
Sector
Commercial
Permit type
Tenant improvement
City
Bellevue, WA
ZIP code
98004
Status
Issued
Permit no.
26 106318 BZ

All permits in this project 3

Remodel 10850 NE 6th StSound Transit Stride Bus Rapid Transit (BRT) along Interstate 405 (I-405) and State Route (SR) 518 corridor will provide service for 37 miles between Lynnwood and Burien. The Stride BRT service in this corridor would operate as two routes: a north Stride BRT line (S2) with terminal stations at the Lynnwood City Center and the Bellevue Transit Center, and a south Stride BRT line (S1) with terminal stations at the Burien Transit Center and the Bellevue Transit Center. The two routes would connect at the Bellevue Transit Center, where passengers would be able to transfer between the north and south Stride BRT lines to other bus routes and connect to Link light rail. This building permit is for proposed improvements to Bellevue Transit Center, specifically roof remodel work and other supporting elements for Bus Shelter #3 (Bus Bays 6 and 7) at Bellevue Transit Center, 10804 NE 6th Street. In general, work includes: Removing and replacing portions of the existing concrete and brick platform within the transit center island; replacing existing shelter canopy light fixtures, installing pylon structure with message sign screen; touch ups to existing worn windscreens; cutting back roof edges of the transit center island; modifying existing bus bays to accommodate passenger pick up, vehicles, and install system features; installing pavers for accessible boarding zones; removal of benches and tree grates. 3mo ago MAIN PERMIT Remodel 10850 NE 6th StSound Transit Stride Bus Rapid Transit (BRT) along the Interstate 405 (I-405) and State Route (SR) 518 corridor will provide service for 37 miles between Lynnwood and Burien. The Stride BRT service in this corridor would operate as two routes: a north Stride BRT line (S2) with terminal stations at the Lynnwood City Center and the Bellevue Transit Center, and a south Stride BRT line (S1) with terminal stations at the Burien Transit Center and the Bellevue Transit Center. The two routes would connect at the Bellevue Transit Center, where passengers would be able to transfer between the north and south Stride BRT lines to other bus routes and connect to Link light rail. This building permit is for proposed improvements to Bellevue Transit Center, specifically roof remodel work and other supporting elements for Bus Shelter #2 (Bus Bays 3, 4, 5, 8, 9, 10) at Bellevue Transit Center, 10804 NE 6th Street. In general, work includes: Removing and replacing portions of the existing concrete and brick platform within the transit center island; replacing existing shelter canopy light fixtures, installing pylon structure with message sign screen; touch ups to existing worn windscreens; cutting back roof edges of the transit center island; modifying existing bus bays to accommodate passenger pick up, vehicles, and install system features; installing pavers for accessible boarding zones; removal of benches, tree grates, windscreens. 3mo ago THIS PERMIT Remodel 10850 NE 6th StSound Transit Stride Bus Rapid Transit (BRT) along Interstate 405 (I-405) and State Route (SR) 518 corridor will provide service for 37 miles between Lynnwood and Burien. The Stride BRT service in this corridor would operate as two routes: a north Stride BRT line (S2) with terminal stations at the Lynnwood City Center and the Bellevue Transit Center, and a south Stride BRT line (S1) with terminal stations at the Burien Transit Center and the Bellevue Transit Center. The two routes would connect at the Bellevue Transit Center, where passengers would be able to transfer between the north and south Stride BRT lines to other bus routes and connect to Link light rail. This building permit is for proposed improvements to Bellevue Transit Center, specifically roof remodel work and other supporting elements for Bus Shelter #1 (Bus Bays 2 and 11) at 10804 NE 6th Street. In general, work in Shelter 1 includes: Removing and replacing portions of the existing concrete and brick platform within the transit center island; replacing existing shelter canopy light fixtures, installing pylon structure with message sign screen; removing two windscreens at Bay 11, and touch ups to more worn windscreens; and cutting back roof edges of the transit center island. City of Bellevue has approved a LUX application for this project (Application ID: ) which consists of the same scope of work. 3mo ago