10850 NE 6th St
Bellevue, WA 98004 Issued Jun 24, 2026 Tenant improvement
Scope of work
Sound Transit Stride Bus Rapid Transit (BRT) along Interstate 405 (I-405) and State Route (SR) 518 corridor will provide service for 37 miles between Lynnwood and Burien. The Stride BRT service in this corridor would operate as two routes: a north Stride BRT line (S2) with terminal stations at the Lynnwood City Center and the Bellevue Transit Center, and a south Stride BRT line (S1) with terminal stations at the Burien Transit Center and the Bellevue Transit Center. The two routes would connect at the Bellevue Transit Center, where passengers would be able to transfer between the north and south Stride BRT lines to other bus routes and connect to Link light rail. This building permit is for proposed improvements to Bellevue Transit Center, specifically roof remodel work and other supporting elements for Bus Shelter #1 (Bus Bays 2 and 11) at 10804 NE 6th Street. In general, work in Shelter 1 includes: Removing and replacing portions of the existing concrete and brick platform within the transit center island; replacing existing shelter canopy light fixtures, installing pylon structure with message sign screen; removing two windscreens at Bay 11, and touch ups to more worn windscreens; and cutting back roof edges of the transit center island. City of Bellevue has approved a LUX application for this project (Application ID: ) which consists of the same scope of work.
Permit timeline
- AppliedMar 19, 202697 days in review
- IssuedJun 24, 20263mo ago
- ExpiresJun 23, 2029in 979 days
Details
- Project type
- Tenant improvement
- Work class
- Nonresidential
- Sector
- Commercial
- Permit type
- Tenant improvement
- City
- Bellevue, WA
- ZIP code
- 98004
- Status
- Issued
- Permit no.
- 26 106323 BZ