5207 S Harper Ave
Chicago, IL 60615 Issued Jul 27, 2026 Renovation / alteration
This permit is one piece of a 6-permit project.View the main permit
Declared value
$8.6M$8,600,000, whole project
Size
Not reported
Floors
Not reported
Units
Not reported
Scope of work
Wet lab east side phase 3 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction)
Permit timeline
- AppliedJul 22, 20265 days in review
- IssuedJul 27, 20262mo ago
- StatusActiveWork in progress
Details
- Project type
- Renovation / alteration
- Work class
- Not reported
- Sector
- Not reported
- Permit type
- Renovation / alteration
- City
- Chicago, IL
- ZIP code
- 60615
- Status
- Active
- Permit no.
- 101085836
All permits in this project 6
Remodel
5207 S Harper AveCorridor and conference center - phase 1 of initial buildout on the 8th floor within an existing mixed-use building for a non-hasardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction)
2mo ago
MAIN PERMIT
Remodel
5207 S Harper AveRevision to permit 101085095 removing previously permitted scope, except for lighting to prep space for another laboratory space under separate permit of a business use non-hazardous laboratory space (occupancy group b; type 1a construction)
5w ago
Remodel
5207 S Harper AveSc/ 2019 cbrc - interior alterations on floors 3-11 for installation of additional electrical service to include new conduit and equipment, switchboards bus duct, feeder connectors, shunt, trip breakers and fire department emergency power off (epo) (occupancy group b; type 1a construction)
7w ago
Remodel
5207 S Harper AveQuantum lab west side phase 2 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes and vibration mitigation structure. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction) (structural peer review)
2mo ago
Remodel
5207 S Harper AveWet lab east side phase 3 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction)
2mo ago
THIS PERMIT
Remodel
5207 S Harper AveScope: nonstructural interior alteration to existing mechanical, plumbing and electrical at existing lab.locations: 0 residential unit(s), 1 non-residential unit(s), 6th floor room 0697
4mo ago
COMPLETED