5207 S Harper Ave
Chicago, IL 60615 Issued Sep 11, 2026 Renovation / alteration
This permit is one piece of a 6-permit project.View the main permit
Declared value
$8.6M$8,600,000, whole project
Size
Not reported
Floors
Not reported
Units
Not reported
Scope of work
Revision to permit 101085095 removing previously permitted scope, except for lighting to prep space for another laboratory space under separate permit of a business use non-hazardous laboratory space (occupancy group b; type 1a construction)
Permit timeline
- AppliedSep 3, 20268 days in review
- IssuedSep 11, 20265w ago
- StatusActiveWork in progress
Details
- Project type
- Renovation / alteration
- Work class
- Not reported
- Sector
- Not reported
- Permit type
- Renovation / alteration
- City
- Chicago, IL
- ZIP code
- 60615
- Status
- Active
- Permit no.
- 101087882
All permits in this project 6
Remodel
5207 S Harper AveCorridor and conference center - phase 1 of initial buildout on the 8th floor within an existing mixed-use building for a non-hasardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction)
2mo ago
MAIN PERMIT
Remodel
5207 S Harper AveRevision to permit 101085095 removing previously permitted scope, except for lighting to prep space for another laboratory space under separate permit of a business use non-hazardous laboratory space (occupancy group b; type 1a construction)
5w ago
THIS PERMIT
Remodel
5207 S Harper AveSc/ 2019 cbrc - interior alterations on floors 3-11 for installation of additional electrical service to include new conduit and equipment, switchboards bus duct, feeder connectors, shunt, trip breakers and fire department emergency power off (epo) (occupancy group b; type 1a construction)
7w ago
Remodel
5207 S Harper AveQuantum lab west side phase 2 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes and vibration mitigation structure. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction) (structural peer review)
2mo ago
Remodel
5207 S Harper AveWet lab east side phase 3 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction)
2mo ago
Remodel
5207 S Harper AveScope: nonstructural interior alteration to existing mechanical, plumbing and electrical at existing lab.locations: 0 residential unit(s), 1 non-residential unit(s), 6th floor room 0697
4mo ago
COMPLETED