Remodel 6 permits in this project Active

5207 S Harper Ave

Chicago, IL 60615 Issued Sep 11, 2026 Renovation / alteration

This permit is one piece of a 6-permit project.View the main permit
Declared value $8.6M$8,600,000, whole project
Size Not reported
Floors Not reported
Units Not reported

Scope of work

Revision to permit 101085095 removing previously permitted scope, except for lighting to prep space for another laboratory space under separate permit of a business use non-hazardous laboratory space (occupancy group b; type 1a construction)

Permit timeline

  1. AppliedSep 3, 20268 days in review
  2. IssuedSep 11, 20265w ago
  3. StatusActiveWork in progress

Details

Project type
Renovation / alteration
Work class
Not reported
Sector
Not reported
Permit type
Renovation / alteration
City
Chicago, IL
ZIP code
60615
Status
Active
Permit no.
101087882

All permits in this project 6

Remodel 5207 S Harper AveCorridor and conference center - phase 1 of initial buildout on the 8th floor within an existing mixed-use building for a non-hasardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction) 2mo ago MAIN PERMIT Remodel 5207 S Harper AveRevision to permit 101085095 removing previously permitted scope, except for lighting to prep space for another laboratory space under separate permit of a business use non-hazardous laboratory space (occupancy group b; type 1a construction) 5w ago THIS PERMIT Remodel 5207 S Harper AveSc/ 2019 cbrc - interior alterations on floors 3-11 for installation of additional electrical service to include new conduit and equipment, switchboards bus duct, feeder connectors, shunt, trip breakers and fire department emergency power off (epo) (occupancy group b; type 1a construction) 7w ago Remodel 5207 S Harper AveQuantum lab west side phase 2 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes and vibration mitigation structure. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction) (structural peer review) 2mo ago Remodel 5207 S Harper AveWet lab east side phase 3 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazardous laboratory space. Work includes new non-load bearing partitions, doors, ceilings, millwork and finishes. Along with associated electrical power and lighing, mechanical ventilation, and plumbing work (occupancy group b; type 1a construction) 2mo ago Remodel 5207 S Harper AveScope: nonstructural interior alteration to existing mechanical, plumbing and electrical at existing lab.locations: 0 residential unit(s), 1 non-residential unit(s), 6th floor room 0697 4mo ago COMPLETED