By trade
Projects with a permit this week. Pick one for its page.
The construction projects Cleveland permitted from Nov 18 to 24, biggest first, with the builder on each one. A new week every morning.
Projects that got a permit from Nov 18 to 24, by declared value. Each card opens the full lead: the work, the size and the builder on the permit.
Make interior alterations for stair, elevator equipment room, materials lift, & new lula per approved plans. New equipment room/space per asme 18.1. Separate permits required for HVAC, electrical and elevator. Submit permit application to fpb for alterations to fire protection systems. Maintain obc chapter 33 safeguards during construction.
Alterations of university hospitals 2nd floor mather pavilion cmc- core a hld. Electrical & HVAC permits are required. Construction documents are required to be submitted for review and approval for the automatic fire sprinkler and fire alarm and detection systems. The water demand at the base of the sprinkler riser and the hazard classification must be provided to the building department. No certificate of occupancy to be issued with this permit.
Make interior alterations to a 6,262 SF spa in the basement of a two-story masonry building per approved plans. Plumbing, HVAC, electrical and fire protection permits are required. Certificate of occupancy is required.
Erect a new 2 story, 20' x 50' single family home and a 12' in height, 24' x 24' detached garage in the rear half of the lot on an existing lot of record as per plan. Seperate: Elec, Plum, HVac, Sidewalk, Street Opening Permit Req'd. Haul Away Debris
Erect 2.5 story, 1,303SF wood-frame 1Du home "metro manor" w/ attached 2-car garage per approved plans + cpc approval. Sep m/e/p permits + c/o required. Note that attached garage shall be separated from dwelling w/ not less than 5/8" type 'x' gypsum wall board per orc 302.5 + 302.6.
Erect 2.5 story, 1,303SF wood-frame 1Du home "metro manor" w/ attached 2-car garage per approved plans + cpc approval. Sep m/e/p permits + c/o required. Note that attached garage shall be separated from dwelling w/ not less than 5/8" type 'x' gypsum wall board per orc 302.5 + 302.6.
Erect 2.5 story, 1,303SF wood-frame 1Du home "metro manor" w/ attached 2-car garage per approved plans + cpc approval. Sep m/e/p permits + c/o required. Note that attached garage shall be separated from dwelling w/ not less than 5/8" type 'x' gypsum wall board per orc 302.5 + 302.6.
Erect 2.5 story, 1,303SF wood-frame 1Du home "metro manor" w/ attached 2-car garage per approved plans + cpc approval. Sep m/e/p permits + c/o required. Note that attached garage shall be separated from dwelling w/ not less than 5/8" type 'x' gypsum wall board per orc 302.5 + 302.6.
Erect 2.5 story, 1,303SF wood-frame 1Du home "metro manor" w/ attached 2-car garage per approved plans + cpc approval. Sep m/e/p permits + c/o required. Note that attached garage shall be separated from dwelling w/ not less than 5/8" type 'x' gypsum wall board per orc 302.5 + 302.6.
Erect a new 2-story, ± 1,303 single family home with detached garage per BOZA resolution 26-035 per plan. Seperate: Elec, Plum, Hvac, Sidewalk and Street opening permit req'd. Haul Away Debris.
Make interior alterations to 1200 SF emergency room in building E on Cleveland clinic main campus per approved plans. Separate HVAC, electrical and fire protection permits are required.
Make interior alterations to 270 SF emergency xray room per approved plans. Separate plumbing, HVAC, electrical, and fire protection permits are required.
The trades, the companies pulling the most permits and the ZIP codes with the most new projects in Cleveland from Nov 18 to 24.
Projects with a permit this week. Pick one for its page.
Companies with the most permits this week. Pick one to see their jobs.
New projects by ZIP code. Pick one to see them on the map.
New permits in Cleveland with the builder on each one: once a week free, every morning with Pro.