By trade
Projects with a permit this week. Pick one for its page.
The construction projects Mesa permitted from Nov 19 to 25, biggest first, with the builder on each one. A new week every morning.
Projects that got a permit from Nov 19 to 25, by declared value. Each card opens the full lead: the work, the size and the builder on the permit.
Group A-2. Type V-B construction. 4,256 SF. Occupant load 118. Nonseparated occupancy building. Existing restaurant suite. New demising wall, architectural, and MEP. Interior Demo Deferred fire sprinklers. Approved as noted. Results in CofO.
SHEA HOMES #5016 - new 3505 SF two story residence with a 3 car garage at avalon crossing. Inclues many elevation options. New water, electric and gas meters. Revised and added sheets for foundation slab depth for phase 2 foundations. Special inspection for post tension slabs.
SHEA HOMES #5016 - new 3505 SF two story residence with a 3 car garage at avalon crossing. Inclues many elevation options. New water, electric and gas meters. Revised and added sheets for foundation slab depth for phase 2 foundations. Special inspection for post tension slabs.
New 2757 SF two story residence with a 2+ car garage at hawes crossing. Includes options for guest suites and expanded laundry rooms. Includes water, electric and gas meters. Special inspections for post tensions slabs. Multi-gen suite ilo garage storage: revised header, posts, and bearing hatch at bath 3: - opt. Door at opt. Multi-gen suite ilo garage storage: added option: sheet s3.02 opt. Multi-gen suite ilo garage storage: revised length of braced wall at bath 3: - opt. Door at opt. Multi-gen suite ilo garage storage: added option.
New 1960 SF single story residence with a 2 car garage in Hawes Crossing. Includes a wrap-around porch option at corner lots. new electric, gas and water meters. Special inspection required for post tension slabs.
Remodel of existing residence into a two-bedroom, den, 3 baths, new 385 S.F. patio addition to existing residence, a detached ADU/garage at rear of property. New 370 S.F. livable ADU attached to new 2015 S.F. garage. Special Inspections required for Drill & Epoxy. Minimum required building inspections: Footing, stem, strap/shear, frame, insulation, drywall shear and final. If needed, underground electrical and plumbing.
Remodel existing facility plus add 1,516 SF livable addition and 193 SF covered patios (x2). Work includes architectural, structural, and MEP: relocate existing 200 amp electric service panel. Special Inspections: Epoxied dowels. Minimum required building inspections: Footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear and final. If needed, underground electrical and plumbing.
New 1,216 SF livable addition, removing existing 124 SF rear covered patio and installing a new 144 SF rear covered patio, adding 208 SF of storage rooms, extending the front porch by 139 SF, remodeling 710 SF with some MPE improvements. Minimum required building inspections: Footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear and final. If needed, underground electrical and plumbing.
Construction of 1151 sq ft of new livable space and 20 sq ft porch to existing SFR, including plumbing, electrical and mechanical. VB construction. Minimum required building inspections: Footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, mechanical final, electrical final, plumbing final and final. If needed, underground electrical and plumbing.
Occupancy verification. Existing 1,180 SF(gross), type V-B construction. Change occupancy from group B occupancy to group M occupancy for retail store. No MPE change. Install of shelves and display cabinets only. Existing (1) ADA restroom. Reviewed as noted. Results in CofO.
Restoration of a damaged building.
Construction of new 1247 sq ft RV Garage with non-livable storage space on second floor at existing SFR. New electrical and mini-split mechanical systems. VB construction. Minimum required inspections: Footing, stem, strap/shear, frame, electrical rough, mechanical rough, insulation, drywall shear, electrical final, mechanical final and final. If needed, underground electrical.
The trades, the companies pulling the most permits and the ZIP codes with the most new projects in Mesa from Nov 19 to 25.
Projects with a permit this week. Pick one for its page.
Companies with the most permits this week. Pick one to see their jobs.
New projects by ZIP code. Pick one to see them on the map.
New permits in Mesa with the builder on each one: once a week free, every morning with Pro.