By trade
Projects with a permit this week. Pick one for its page.
The construction projects New Orleans permitted from Nov 19 to 25, biggest first, with the builder on each one. A new week every morning.
Projects that got a permit from Nov 19 to 25, by declared value. Each card opens the full lead: the work, the size and the builder on the permit.
Non-structural renovation of an existing 146-unit apartment building including, but not limited to, exterior and interior paint, re-glazing of windows, roof repairs, exterior signage repair, exterior and interior lighting, elevator modernization, repair and/or replacement of condensers and AAON units, replacement appliances, cabinetry, flooring, and plumbing fixtures, door hardware and access control, and in-unit laundry
Work on the second floor. Equipment swap of an existing Cath Lab at Baptist Medical Center (Magnolia Building), along with architectural, structural, mechanical, and electrical modifications necessary for installation of the new equipment
Single Family New Construction; 2,410 sq ft living space, 4 bed/3.5 bath, two story with a driveway
New construction, two-story, two family 3,020 sq.ft living space with a driveway and carport
Electrical Work, Carpentry, Painting, and half bath renovation as per plans
New Construction of a two story, two family home- 2,062 sq.ft conditioned space
New construction two family
New construction of a 2,070 sq ft, 2-story, two-family home. Each unit is to have a driveway, 1,035 sq ft, 3 beds, and 2 baths. To be built as per plans
Deck and Patio cover addition
New construction of a 2,326 sq ft, 2-story, single-family home with a driveway, 4 beds, and 2.5 baths. To be built as per plans
New Construction of a one story, 1946sqft, 4 bed, 3 bath, single family dwelling. To be built as per plans
Renovation of second floor. Renovations consisting of drywall, flooring, partial electrical, plumbing and HVAC, balcony deck flooring, windows, doors, framing, metal railing(s), insulation, painting. FINAL INSPECTION Any additional square feet at ground level must match existing floor elevation of +1.4 NAVD
The trades, the companies pulling the most permits and the ZIP codes with the most new projects in New Orleans from Nov 19 to 25.
Projects with a permit this week. Pick one for its page.
Companies with the most permits this week. Pick one to see their jobs.
New projects by ZIP code. Pick one to see them on the map.
New permits in New Orleans with the builder on each one: once a week free, every morning with Pro.