By trade
Projects with a permit this week. Pick one for its page.
The construction projects Philadelphia permitted from Nov 20 to 26, newest first, with the builder on each one. A new week every morning.
Projects that got a permit from Nov 20 to 26. Each card opens the full lead: the work, the size and the builder on the permit.
Level II alterations to an existing structure. Alterations to include the erection of partition walls, new finishes/furnishings and accessibility improvements throughout.
Level III alterations with partial change of occupancy (no change of occupancy classification, group r-3 to group r-3) to create a two-family dwelling within an existing two (2) story building existing building not required to be sprinklered. 2021 irc review .
Level II interior alteration to an existing structure. Work to include a change of occupancy for the creation of additional fourteen(14) dwelling units on the 4th floor for a total of 106 units in an existing structure, business and professional offices in the basement. Alterations to include selective demolition and the erection of partition walls, provide finishes/furnishings, and accessibility improvements throughout. Building to be fully sprinklered per nfpa13. Standpipe system.
Construction of an attached structure. For use as multi-family (5 unit) household living. Separate permits for electrical, plumbing, mechanical, and fire-suppression work. .
New construction of a three-story building with basement and rear deck for use as seven (7) dwelling units building to be fully sprinklered per nfpa 13. 2021 ibc review .
Level II alterations to an existing structure. Alterations to include the erection of partition walls, new finishes/furnishings and accessibility improvements throughout.
Level II interior alterations (no change in occupancy ) to a portion of the 22nd floor level of an existing structure.
Level II interior alterations to include a change in occupancy without change in occupancy classification. To provide one(1) additional unit in an existiong structure . For a total of six(6) dwelling units and a vacant commercial speac at the ground floor (separate use registration permit required prior to occupancy).
Level II interior alterations (no change in occupancy ) to an existing tenatnt space.
Level II alterations to an existing attached structure. Alterations to include the erection of partition walls, provide finishes/furnishings and accessibility improvements throughout. For use as public, civic, and institutional-adult care.
Level II alterations to an existing structure. Alterations to include partial demolition and the erection of partition walls, provide finishes/furnishings and accessibility improvements throughout. For use as previously approved.
Change of occupancy at area 2 and level II alterations to include ramps, new partitions, fixtures, furnishings, finishes.
The trades, the companies pulling the most permits and the ZIP codes with the most new projects in Philadelphia from Nov 20 to 26.
Projects with a permit this week. Pick one for its page.
Companies with the most permits this week. Pick one to see their jobs.
New projects by ZIP code. Pick one to see them on the map.
New permits in Philadelphia with the builder on each one: once a week free, every morning with Pro.